Measure and light
Elevations, door swings, and how the wall is approached. We note morning sun, lamps, and anything that will sit in front of the painting.
Process
Color comes last. First we measure the room, then we draw the mural on the wall at full scale. You approve the drawing before pigment goes on.
Elevations, door swings, and how the wall is approached. We note morning sun, lamps, and anything that will sit in front of the painting.
Two rounds of drawings against those elevations. Scale, not mood boards. If the furniture line kills the composition, we change the composition.
Charcoal and thin wash at full size. This is the last cheap moment to move a branch or a column. Sign-off happens here.
Lime or mineral ground, then color. Cure time is part of the schedule. We leave a touch-up note, not a mystery.
On site
A typical residential wall is one to two weeks on site after plaster is ready. Hospitality jobs follow the GC’s sequence. We do not paint over fresh joint compound and hope.
Aftercare
Each commission includes a one-page note: what the wall can take, what it cannot, and who to call for a touch-up. Sample-site inquiries are not a commission desk — they go to SvelteSoft.